Scientific Quality Review
Peer Review Schedules
|
Directions for Setting Termination Dates
|
|
The dates listed are projected. Actual dates are announced at the beginning
of each peer review session. For efficiency, we simply calculate
the termination date as 6 months beyond the projected implementation
date. If you have used a different date, theres no need to
change it if its beyond the projected implementation date.
This method eases our coordination in the event peer review sessions
are added or postponed.
|
|
|
Animal Production & Protection
|
Nutrition, Food Safety/Quality
|
Natural Resources and Sustainable Agricultural Systems
|
Crop Production & Protection
|
|
|
|
|
|
|
|
Review Title
NP 101 Food Animal Production Panel Review
|
|
Termination Date
March 30, 2013
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
32
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modifed under the Food Animal Production Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
September 16, 2011
|
|
PDRAMs Due to Area & OSQR with Schedule
|
October 14, 2011
|
|
Conflicts of Interest List Due to OSQR
|
October 28, 2011
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
April 13, 2012
|
|
Review Period
|
April 16-July 20, 2012
|
|
Project's Targeted Implementation Date
|
September 14, 2012
|
Ad Hoc Cut-Off Date
July 29, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 103 Animal Health Panel Review
|
|
Termination Date
April 30, 2012
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
45
|
Planned Duration
60 months
|
|
Status of Reviews
Long term planning in progress. No new ad hoc reviews are being scheduled in this program.
|
|
Concurrence Memo Due to Area Director
|
October 20, 2010
|
|
PDRAMs Due to Area & OSQR with Schedule
|
November 17, 2010
|
|
Conflicts of Interest List Due to OSQR
|
December 1, 2010
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
May 18, 2011
|
|
Review Period
|
May 19 - August 24, 2011
|
|
Project's Targeted Implementation Date
|
October 19, 2011
|
Ad Hoc Cut-Off Date
September 1, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 104 Veterinary, Medical and Urban Entomology Panel Review
|
|
Termination Date
March 31, 2010
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
17
|
Planned Duration
60 months
|
|
Status of Reviews
Reviews are in progress.
|
|
Concurrence Memo Due to Area Director
|
July 28, 2008
|
|
PDRAMs Due to Area & OSQR with Schedule
|
August 25, 2008-complete
|
|
Conflicts of Interest List Due to OSQR
|
September 8, 2008-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
December 22, 2008-complete
|
|
Project Plans due to OSQR
|
April 13, 2009-complete
|
|
Review Period
|
April 14 - July 20, 2009
|
|
Project's Targeted Implementation Date
|
September 14, 2009
|
Ad Hoc Cut-Off Date
July 28, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 104 Veterinary, Medical and Urban Entomology Panel Review - Future
|
|
Termination Date
March 30, 2015
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
17
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Veterinary, Medical, and Urban Entomology Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
October 4, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
October 11, 2013
|
|
Conflicts of Interest List Due to OSQR
|
October 25, 2013
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
April 11, 2014
|
|
Review Period
|
April 14-July 18, 2014
|
|
Project's Targeted Implementation Date
|
September 12, 2014
|
Ad Hoc Cut-Off Date
October 4, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 106 Aquaculture 2010 Ad Hoc Review
|
|
Termination Date
June 30, 2015
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
1
|
Planned Duration
55 months
|
|
Status of Reviews
The PDRAM is due December 8, 2009.
|
|
Concurrence Memo Due to Area Director
|
November 10, 2009
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 8, 2009
|
|
Conflicts of Interest List Due to OSQR
|
December 22, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
June 8, 2010
|
|
Review Period
|
June 9-September 14, 2009
|
|
Project's Targeted Implementation Date
|
November 9, 2010
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 106 Aquaculture Panel Review
|
|
Termination Date
June 30, 2010
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
25
|
Planned Duration
60 months
|
|
Status of Reviews
Project plans are due to OSQR July 10, 2009.
|
|
Concurrence Memo Due to Area Director
|
September 23, 2008-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
October 21, 2008-complete
|
|
Conflicts of Interest List Due to OSQR
|
November 4, 2008-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
March 20, 2009-complete
|
|
Project Plans due to OSQR
|
July 10, 2009
|
|
Review Period
|
July 20 - October 16, 2009
|
|
Project's Targeted Implementation Date
|
December 11, 2009
|
Ad Hoc Cut-Off Date
August 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 106 Aquaculture Panel Review - Future
|
|
Termination Date
June 30, 2015
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
25
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Aquaculture Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
January 3, 2014
|
|
PDRAMs Due to Area & OSQR with Schedule
|
January 10, 2014
|
|
Conflicts of Interest List Due to OSQR
|
January 24, 2014
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
July 11, 2014
|
|
Review Period
|
July 14 - October 17, 2014
|
|
Project's Targeted Implementation Date
|
December 12, 2014
|
Ad Hoc Cut-Off Date
January 3, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 107 Human Nutrition - Future
|
|
Termination Date
September 30, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
65
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modifed under the Human Nutrition Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
March 4, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
April 1, 2013
|
|
Conflicts of Interest List Due to OSQR
|
April 15, 2013
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
September 30, 2013
|
|
Review Period
|
October 1, 2013-January 6, 2014
|
|
Project's Targeted Implementation Date
|
March 3, 2014
|
Ad Hoc Cut-Off Date
February 4, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 107 Human Nutrition 2010 Ad Hoc Review
|
|
Termination Date
September 30, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
2
|
Planned Duration
46 months
|
|
Status of Reviews
PDRAMs are due December 8, 2009.
|
|
Concurrence Memo Due to Area Director
|
November 10, 2009
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 8, 2009
|
|
Conflicts of Interest List Due to OSQR
|
December 22, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
June 8, 2010
|
|
Review Period
|
June 9 - September 14, 2010
|
|
Project's Targeted Implementation Date
|
November 9, 2010
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 107 Human Nutrition December 2009 Ad Hoc Review
|
|
Termination Date
September 30, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
4
|
Planned Duration
53 months
|
|
Status of Reviews
PPOs are due to OSQR August 11, 2009.
|
|
Concurrence Memo Due to Area Director
|
April 7, 2009-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
April 14, 2009-complete
|
|
Conflicts of Interest List Due to OSQR
|
April 28, 2009-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
August 11, 2009
|
|
Project Plans due to OSQR
|
December 1, 2009
|
|
Review Period
|
December 2, 2009-February 9, 2010
|
|
Project's Targeted Implementation Date
|
April 19, 2010
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 107 Human Nutrition June 2009 Ad Hoc Review
|
|
Termination Date
September 30, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
10
|
Planned Duration
58 months
|
|
Status of Reviews
Reviews are in progress.
|
|
Concurrence Memo Due to Area Director
|
October 10, 2008-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
October 17, 2008-complete
|
|
Conflicts of Interest List Due to OSQR
|
October 31, 2008-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
February 13, 2009-complete
|
|
Project Plans due to OSQR
|
June 5, 2009-complete
|
|
Review Period
|
June 8-September 11, 2009
|
|
Project's Targeted Implementation Date
|
November 20, 2009
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 107 Human Nutrition October 2009 Ad Hoc Review
|
|
Termination Date
September 30, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
4
|
Planned Duration
56 months
|
|
Status of Reviews
Plans are due September 15, 2009
|
|
Concurrence Memo Due to Area Director
|
May 29, 2009-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
June 12, 2009-complete
|
|
Conflicts of Interest List Due to OSQR
|
June 12, 2009-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
September 15, 2009
|
|
Review Period
|
September 16-November 23, 2009
|
|
Project's Targeted Implementation Date
|
February 1, 2010
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 107 Human Nutrition Panel Review - Schedule A
|
|
Termination Date
June 30, 2009
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
65
|
Planned Duration
60 months
|
|
Status of Reviews
Revision and certification in progress.
|
|
Concurrence Memo Due to Area Director
|
September 28, 2007-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
October 26, 2007-complete
|
|
Conflicts of Interest List Due to OSQR
|
November 8, 2007-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
February 22, 2008-complete
|
|
Project Plans due to OSQR
|
June 13, 2008-complete
|
|
Review Period
|
June 16 - September 19, 2008-complete
|
|
Project's Targeted Implementation Date
|
December 22, 2008
|
Ad Hoc Cut-Off Date
August 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 107 Human Nutrition Panel Review - Schedule B
|
|
Termination Date
June 30, 2009
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
65
|
Planned Duration
60 months
|
|
Status of Reviews
Revision and certification in progress.
|
|
Concurrence Memo Due to Area Director
|
September 28, 2007-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 3, 2007-complete
|
|
Conflicts of Interest List Due to OSQR
|
December 17, 2007-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
March 31, 2008-complete
|
|
Project Plans due to OSQR
|
July 21, 2008-complete
|
|
Review Period
|
July 22 - October 27, 2008-complete
|
|
Project's Targeted Implementation Date
|
December 22, 2008
|
Ad Hoc Cut-Off Date
August 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 108 Food Safety Panel Review
|
|
Termination Date
August 31, 2011
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
68
|
Planned Duration
60 months
|
|
Status of Reviews
Long term planning in progress. No new ad hoc reviews are being scheduled in this program.
|
|
Concurrence Memo Due to Area Director
|
February 5, 2010
|
|
PDRAMs Due to Area & OSQR with Schedule
|
March 5, 2010
|
|
Conflicts of Interest List Due to OSQR
|
March 19, 2010
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
September 3, 2010
|
|
Review Period
|
September 7-December 10, 2010
|
|
Project's Targeted Implementation Date
|
February 18, 2011
|
Ad Hoc Cut-Off Date
October 6, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 202/212 Soil Resource Management Panel Review
|
|
Termination Date
December 31, 2011
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
25
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hoc reviews are being scheduled in this program.
|
|
Concurrence Memo Due to Area Director
|
June 17, 2010
|
|
PDRAMs Due to Area & OSQR with Schedule
|
July 15, 2010
|
|
Conflicts of Interest List Due to OSQR
|
July 29, 2010
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
January 12, 2011
|
|
Review Period
|
January 13 - April 20, 2011
|
|
Project's Targeted Implementation Date
|
June 15, 2011
|
Ad Hoc Cut-Off Date
May 19, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 203/204/212 Soil and Air Resource Management Panel Review
|
|
Termination Date
October 31, 2010
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
20
|
Planned Duration
60 months
|
|
Status of Reviews
PPOs are due from ONP to the Area and OSQR July 15, 2009.
|
|
Concurrence Memo Due to Area Director
|
February 18, 2009-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
March 18, 2009-complete
|
|
Conflicts of Interest List Due to OSQR
|
April 1, 2009-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
July 15, 2009
|
|
Project Plans due to OSQR
|
November 4, 2009
|
|
Review Period
|
November 5, 2009 - February 10, 2010
|
|
Project's Targeted Implementation Date
|
April 7, 2010
|
Ad Hoc Cut-Off Date
December 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 206/214 Manure and Byproduct Utilization Panel Review
|
|
Termination Date
January 31, 2011
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
27
|
Planned Duration
60 months
|
|
Status of Reviews
PDRAMs are due to the Area and OSQR on August 13, 2009.
|
|
Concurrence Memo Due to Area Director
|
July 16, 2009
|
|
PDRAMs Due to Area & OSQR with Schedule
|
August 13, 2009
|
|
Conflicts of Interest List Due to OSQR
|
August 27, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
February 11, 2010
|
|
Review Period
|
February 12-May 21, 2010
|
|
Project's Targeted Implementation Date
|
July 16, 2010
|
Ad Hoc Cut-Off Date
July 28, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 211 Water Availability and Watershed Management Panel Review
|
|
Termination Date
August 31, 2012
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
49
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hoc reviews are being scheduled in this program.
|
|
Concurrence Memo Due to Area Director
|
February 9, 2011
|
|
PDRAMs Due to Area & OSQR with Schedule
|
March 9, 2011
|
|
Conflicts of Interest List Due to OSQR
|
March 23, 2011
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
September 7, 2011
|
|
Review Period
|
September 8-December 14, 2011
|
|
Project's Targeted Implementation Date
|
February 12, 2012
|
Ad Hoc Cut-Off Date
November 27, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 213 Bioenergy Panel Review - Future
|
|
Termination Date
April 30, 2015
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
15
|
Planned Duration
Chris
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Bioenergy Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
October 18, 2013
|
|
PDRAMs Due to Area & OSQR with Schedule
|
November 15, 2013
|
|
Conflicts of Interest List Due to OSQR
|
December 2, 2013
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
May 16, 2014
|
|
Review Period
|
May 19-August 22, 2014
|
|
Project's Targeted Implementation Date
|
October 17, 2014
|
Ad Hoc Cut-Off Date
November 8, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 215 Pasture, Forage, Turf and Rangeland Systems Panel Review
|
|
Termination Date
July 30, 2013
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
32
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Rangeland, Pasture and Forages National Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
January 24, 2012
|
|
PDRAMs Due to Area & OSQR with Schedule
|
February 21, 2012
|
|
Conflicts of Interest List Due to OSQR
|
March 20, 2012
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
August 20, 2012
|
|
Review Period
|
August 21 - November 26, 2012
|
|
Project's Targeted Implementation Date
|
January 21, 2013
|
Ad Hoc Cut-Off Date
December 6, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 216 Agricultural System Competiveness and Sustainability Panel Review
|
|
Termination Date
February 28, 2014
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
21
|
Planned Duration
60
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modifed under the Agricultural System Competiveness Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
August 10, 2012
|
|
PDRAMs Due to Area & OSQR with Schedule
|
September 7, 2012
|
|
Conflicts of Interest List Due to OSQR
|
September 21, 2012
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
March 8, 2013
|
|
Review Period
|
March 11 - June 14, 2013
|
|
Project's Targeted Implementation Date
|
August 9, 2013
|
Ad Hoc Cut-Off Date
July 13, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement 2009 Ad Hoc Review
|
|
Termination Date
November 30, 2013
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
2
|
Planned Duration
48 months
|
|
Status of Reviews
Reviews are in progress.
|
|
Concurrence Memo Due to Area Director
|
October 10, 2008-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
October 17, 2008-complete
|
|
Conflicts of Interest List Due to OSQR
|
October 31, 2008-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
February 13, 2009-complete
|
|
Project Plans due to OSQR
|
June 5, 2009-complete
|
|
Review Period
|
June 8 - September 11, 2009
|
|
Project's Targeted Implementation Date
|
November 20, 2009
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement 2010 Ad Hoc Review
|
|
Termination Date
November 30, 2013
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
2
|
Planned Duration
36 months
|
|
Status of Reviews
The PDRAM is due December 8, 2009.
|
|
Concurrence Memo Due to Area Director
|
November 10, 2009
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 8, 2009
|
|
Conflicts of Interest List Due to OSQR
|
December 22, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
June 8, 2010
|
|
Review Period
|
June 9-September 14, 2010
|
|
Project's Targeted Implementation Date
|
November 9, 2010
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule A
|
|
Termination Date
November 30, 2013
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
125
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement National Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
March 29, 2012
|
|
PDRAMs Due to Area & OSQR with Schedule
|
April 26, 2012
|
|
Conflicts of Interest List Due to OSQR
|
May 11, 2012
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
October 29, 2012
|
|
Review Period
|
October 30, 2012-February 5, 2013
|
|
Project's Targeted Implementation Date
|
May 1, 2013
|
Ad Hoc Cut-Off Date
March 29, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule B
|
|
Termination Date
November 30, 2013
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
125
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement National Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
March 29, 2012
|
|
PDRAMs Due to Area & OSQR with Schedule
|
May 25, 2012
|
|
Conflicts of Interest List Due to OSQR
|
June 8, 2012
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
November 26, 2012
|
|
Review Period
|
November 27, 2012-March 5, 2013
|
|
Project's Targeted Implementation Date
|
May 1, 2013
|
Ad Hoc Cut-Off Date
|
|
|
Review Title
NP 302 Plant Biological and Molecular Processes Panel Review
|
|
Termination Date
September 30, 2011
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
43
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hoc reviews are being scheduled for this program.
|
|
Concurrence Memo Due to Area Director
|
March 16, 2010
|
|
PDRAMs Due to Area & OSQR with Schedule
|
April 13, 2010
|
|
Conflicts of Interest List Due to OSQR
|
April 27, 2010
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
October 12, 2010
|
|
Review Period
|
October 13, 2010 - January 17, 2011
|
|
Project's Targeted Implementation Date
|
March 14, 2011
|
Ad Hoc Cut-Off Date
January 25, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 303 Plant Diseases 2009 Ad Hoc Review
|
|
Termination Date
May 31, 2010
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
4
|
Planned Duration
40 months
|
|
Status of Reviews
Reviews are in progress.
|
|
Concurrence Memo Due to Area Director
|
October 10, 2008-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
October 17, 2008-complete
|
|
Conflicts of Interest List Due to OSQR
|
October 31, 2008-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
February 13, 2009-complete
|
|
Project Plans due to OSQR
|
June 5, 2009
|
|
Review Period
|
June 8 - September 11, 2009
|
|
Project's Targeted Implementation Date
|
November 20, 2009
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 303 Plant Diseases Panel Review
|
|
Termination Date
September 30, 2012
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
70
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hoc reviews are being scheduled in this program.
|
|
Concurrence Memo Due to Area Director
|
March 18, 2011
|
|
PDRAMs Due to Area & OSQR with Schedule
|
April 15, 2011
|
|
Conflicts of Interest List Due to OSQR
|
April 29, 2011
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
October 14, 2011
|
|
Review Period
|
October 17, 2011 - January 20, 2012
|
|
Project's Targeted Implementation Date
|
March 16, 2012
|
Ad Hoc Cut-Off Date
January 28, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 304 Crop Protection and Quarantine Panel Review - Schedule A
|
|
Termination Date
April 30, 2011
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
87
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled in this program.
|
|
Concurrence Memo Due to Area Director
|
June 22, 2009
|
|
PDRAMs Due to Area & OSQR with Schedule
|
July 17, 2009
|
|
Conflicts of Interest List Due to OSQR
|
July 31, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
November 13, 2009
|
|
Project Plans due to OSQR
|
March 5, 2010
|
|
Review Period
|
March 8 - June 11, 2010
|
|
Project's Targeted Implementation Date
|
October 4, 2010
|
Ad Hoc Cut-Off Date
December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 304 Crop Protection and Quarantine Panel Review - Schedule B
|
|
Termination Date
April 30, 2011
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
87
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled in this program.
|
|
Concurrence Memo Due to Area Director
|
June 22, 2009
|
|
PDRAMs Due to Area & OSQR with Schedule
|
August 18, 2009
|
|
Conflicts of Interest List Due to OSQR
|
September 1, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
December 15, 2009
|
|
Project Plans due to OSQR
|
April 6, 2010
|
|
Review Period
|
April 7 - July 13, 2010
|
|
Project's Targeted Implementation Date
|
October 4, 2010
|
Ad Hoc Cut-Off Date
December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 304 Crop Protection and Quarantine Panel Review - Schedule C
|
|
Termination Date
April 30, 2011
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
87
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. No new ad hocs are being scheduled in this program.
|
|
Concurrence Memo Due to Area Director
|
June 22, 2009
|
|
PDRAMs Due to Area & OSQR with Schedule
|
September 14, 2009
|
|
Conflicts of Interest List Due to OSQR
|
September 28, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
January 11, 2010
|
|
Project Plans due to OSQR
|
May 3, 2010
|
|
Review Period
|
May 4 - August 9, 2010
|
|
Project's Targeted Implementation Date
|
October 4, 2010
|
Ad Hoc Cut-Off Date
December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 305 Crop Production Panel Review
|
|
Termination Date
May 31, 2014
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
24
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modifed under the Crop Production Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
November 30, 2012
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 28, 2012
|
|
Conflicts of Interest List Due to OSQR
|
January 11, 2013
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
June 28, 2013
|
|
Review Period
|
July 1 - October 4, 2013
|
|
Project's Targeted Implementation Date
|
November 29, 2013
|
Ad Hoc Cut-Off Date
November 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 305 Crop Production Special Ad Hoc Review 2009
|
|
Termination Date
May 31, 2014
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
1
|
Planned Duration
47 months
|
|
Status of Reviews
PPO is due from ONP to the Areas and to OSQR June 18, 2009.
|
|
Concurrence Memo Due to Area Director
|
March 6, 2009-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
March 16, 2009-complete
|
|
Conflicts of Interest List Due to OSQR
|
April 16, 2009-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
June 18, 2009
|
|
Project Plans due to OSQR
|
October 26, 2009
|
|
Review Period
|
October 31-December 31, 2009
|
|
Project's Targeted Implementation Date
|
June 15, 2010
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 306 Quality and Utilization of Agricultural Products 2010 Ad Hoc Review
|
|
Termination Date
November 30, 2013
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
1
|
Planned Duration
34 months
|
|
Status of Reviews
The PDRAM is due December 8, 2009.
|
|
Concurrence Memo Due to Area Director
|
November 10, 2009
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 8, 2009
|
|
Conflicts of Interest List Due to OSQR
|
December 22, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
June 8, 2010
|
|
Review Period
|
June 9-September 14, 2010
|
|
Project's Targeted Implementation Date
|
November 9, 2010
|
Ad Hoc Cut-Off Date
N/A
|
|
|
Review Title
NP 306 Quality and Utilization of Agricultural Products Panel Review - Schedule B
|
|
Termination Date
January 31, 2011
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
88
|
Planned Duration
60 months
|
|
Status of Reviews
PPO's are due to the Area and OSQR September 22, 2009.
|
|
Concurrence Memo Due to Area Director
|
March 30, 2009-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
May 26, 2009-complete
|
|
Conflicts of Interest List Due to OSQR
|
June 9, 2009-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
September 22, 2009
|
|
Project Plans due to OSQR
|
January 12, 2010
|
|
Review Period
|
January 13 - April 20, 2010
|
|
Project's Targeted Implementation Date
|
July 13, 2010
|
Ad Hoc Cut-Off Date
March 30, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 306 Quality and Utilization of Agricultural Products Panel Review - Schedule C
|
|
Termination Date
January 31, 2011
|
Program Analyst:
Chris
|
|
Number of Projects in the Review
88
|
Planned Duration
60 months
|
|
Status of Reviews
PPO's are due to the Area and OSQR October 20, 2009.
|
|
Concurrence Memo Due to Area Director
|
March 30, 2009-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
June 23, 2009-complete
|
|
Conflicts of Interest List Due to OSQR
|
July 6, 2009
|
|
Approved PPOs Due to Area and OSQR from NPS
|
October 20, 2009
|
|
Project Plans due to OSQR
|
February 9, 2010
|
|
Review Period
|
February 10 - May 18, 2010
|
|
Project's Targeted Implementation Date
|
July 13, 2010
|
Ad Hoc Cut-Off Date
March 30, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 307/213 Bioenergy and Energy Alternatives Panel Review
|
|
Termination Date
April 30, 2010
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
15
|
Planned Duration
60 months
|
|
Status of Reviews
Reviews are in progress.
|
|
Concurrence Memo Due to Area Director
|
September 1, 2008-complete
|
|
PDRAMs Due to Area & OSQR with Schedule
|
September 29, 2008-complete
|
|
Conflicts of Interest List Due to OSQR
|
October 14, 2008-complete
|
|
Approved PPOs Due to Area and OSQR from NPS
|
January 26, 2009-complete
|
|
Project Plans due to OSQR
|
May 18, 2009-complete
|
|
Review Period
|
May 19 - August 24, 2009
|
|
Project's Targeted Implementation Date
|
October 19, 2009
|
Ad Hoc Cut-Off Date
June 30, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
|
Review Title
NP 308 Methyl Bromide Panel Review
|
|
Termination Date
May 31, 2013
|
Program Analyst:
Linda
|
|
Number of Projects in the Review
16
|
Planned Duration
60 months
|
|
Status of Reviews
Long-term planning in progress. Existing ARS projects entering or modified under the Methyl Bromide National Program must be considered for an updated peer review.
|
|
Concurrence Memo Due to Area Director
|
November 16, 2011
|
|
PDRAMs Due to Area & OSQR with Schedule
|
December 14, 2011
|
|
Conflicts of Interest List Due to OSQR
|
December 28, 2011
|
|
Approved PPOs Due to Area and OSQR from NPS
|
N/A
|
|
Project Plans due to OSQR
|
June 13, 2012
|
|
Review Period
|
June 14 - September 19, 2012
|
|
Project's Targeted Implementation Date
|
November 14, 2012
|
Ad Hoc Cut-Off Date
September 28, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
|
|
| |
|
Last Updated:
November 27, 2009
|
|
|
|
|