Page Banner

United States Department of Agriculture

Agricultural Research Service

Peer Review Schedules
Directions for Setting Termination Dates
The dates listed are projected. Actual dates are announced at the beginning of each peer review session. For efficiency, we simply calculate the termination date as 6 months beyond the projected implementation date. If you have used a different date, there’s no need to change it if it’s beyond the projected implementation date. This method eases our coordination in the event peer review sessions are added or postponed.
 

Animal Production & Protection

Nutrition, Food Safety/Quality

Natural Resources and Sustainable Agricultural Systems

Crop Production & Protection

101 Food Animal Production December 2013 Ad Hoc Review
101 Food Animal Production December 2014 Ad Hoc Review
101 Food Animal Production June 2014 Ad Hoc Review
101 Food Animal Production
103 Animal Health
104 Veterinary, Medical and Urban Entomology
106 Aquaculture
107 Human Nutrition December 2014 Ad Hoc Review
107 Human Nutrition Schedule A
107 Human Nutrition Schedule A - Future
107 Human Nutrition Schedule B
107 Human Nutrition Schedule B - Future
108 Food Safety (Animal and Plant Products)
306 Quality and Utilization of Agricultural Products Schedule A
306 Quality and Utilization of Agricultural Products Schedule B
211 Water Availability and Watershed Management
212/214 Climate Change, Soils and Emissions
213 Biorefining
215 Pasture, Forage and Rangeland Systems December 2014 Ad Hoc Review
215 Pasture, Forage and Rangeland Systems
216 Agricultural System Competitiveness and Sustainability December 2014 Ad Hoc Review
216 Agricultural System Competitiveness and Sustainability
301 Plant Genetic Resouces, Genomics & Genetic Improvement December 2014 Ad Hoc Review
301 Plant Genetic Resources, Genomics and Genetic Improvement Schedule A
301 Plant Genetic Resources, Genomics and Genetic Improvement Schedule B
301 Plant Genetic Resources, Genomics and Genetic Improvement Schedule C
303 Plant Diseases
304 Crop Protection and Quarantine - Schedule A
304 Crop Protection and Quarantine - Schedule B
305 Crop Production
305 Crop Production - Future
 

Review Title NP 101 Food Animal Production December 2013 Ad Hoc Review
Termination Date   February 28, 2018 Program Analyst:   Chris
Number of Projects in the Review   2 Planned Duration   27 months
Status of Reviews   Revision and certifications in progress.
Concurrence Memo Due to Area Director   May 27, 2013-complete
PDRAMs Due to Area & OSQR with Schedule   June 3, 2013-complete
Conflicts of Interest List Due to OSQR   June 17, 2013-complete
Project Plans due to OSQR   December 2, 2013-complete
Review Period   December 3, 2013- March 10, 2014-complete
Project's Targeted Implementation Date   May 12, 2014
Ad Hoc Cut-Off Date  
N/A
Review Title NP 101 Food Animal Production December 2014 Ad Hoc Review
Termination Date   February 28, 2018 Program Analyst:   Chris
Number of Projects in the Review   1 Planned Duration   27 months
Status of Reviews   PDRAM is due to OSQR June 2, 2014.
Concurrence Memo Due to Area Director   May 19, 2014
PDRAMs Due to Area & OSQR with Schedule   June 2, 2014
Conflicts of Interest List Due to OSQR   June 16, 2014
Project Plans due to OSQR   December 1, 2014
Review Period   December 2014-March 2015
Project's Targeted Implementation Date   May 11, 2015
Ad Hoc Cut-Off Date  
N/A
Review Title NP 101 Food Animal Production June 2014 Ad Hoc Review
Termination Date   February 28, 2018 Program Analyst:   Chris
Number of Projects in the Review   2 Planned Duration   34 months
Status of Reviews   Project plans are due to OSQR June 5, 2014.
Concurrence Memo Due to Area Director   November 21, 2013-complete
PDRAMs Due to Area & OSQR with Schedule   December 5, 2013-complete
Conflicts of Interest List Due to OSQR   December 19, 2013-complete
Project Plans due to OSQR   June 5, 2014
Review Period   June 6-September 11, 2014
Project's Targeted Implementation Date   November 13, 2014
Ad Hoc Cut-Off Date  
N/A
Review Title NP 101 Food Animal Production Panel Review
Termination Date   February 28, 2018 Program Analyst:   Chris
Number of Projects in the Review   30 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Food Animal Production Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   August 19, 2016
PDRAMs Due to Area & OSQR with Schedule   September 2, 2016
Conflicts of Interest List Due to OSQR   September 16, 2016
Project Plans due to OSQR   March 3, 2017
Review Period   March 6-June 9, 2017
Project's Targeted Implementation Date   August 11, 2017
Ad Hoc Cut-Off Date  
August 19, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 103 Animal Health Panel Review
Termination Date   April 30, 2017 Program Analyst:   Linda
Number of Projects in the Review   41 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. No new ad hocs are being scheduled in this National Program.
Concurrence Memo Due to Area Director   November 4, 2015
PDRAMs Due to Area & OSQR with Schedule   November 18, 2015
Conflicts of Interest List Due to OSQR   December 2, 2015
Project Plans due to OSQR   May 18, 2016
Review Period   May 19-August 24, 2016
Project's Targeted Implementation Date   October 26, 2016
Ad Hoc Cut-Off Date  
November 4, 2013. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 104 Veterinary, Medical and Urban Entomology Panel Review
Termination Date   March 30, 2015 Program Analyst:   Linda
Number of Projects in the Review   11 Planned Duration   60 months
Status of Reviews   Reviews are in progress.
Concurrence Memo Due to Area Director   October 4, 2013-complete
PDRAMs Due to Area & OSQR with Schedule   October 11, 2013-complete
Conflicts of Interest List Due to OSQR   October 25, 2013-complete
Project Plans due to OSQR   April 11, 2014-complete
Review Period   April 14-July 18, 2014
Project's Targeted Implementation Date   September 12, 2014
Ad Hoc Cut-Off Date  
September 13, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 106 Aquaculture Panel Review
Termination Date   June 30, 2015 Program Analyst:   Linda
Number of Projects in the Review   17 Planned Duration   60 months
Status of Reviews   Project plans are due to OSQR July 11, 2014.
Concurrence Memo Due to Area Director   December 27, 2013-complete
PDRAMs Due to Area & OSQR with Schedule   January 10, 2014-complete
Conflicts of Interest List Due to OSQR   January 24, 2014-complete
Project Plans due to OSQR   July 11, 2014
Review Period   July 14 - October 17, 2014
Project's Targeted Implementation Date   December 12, 2014
Ad Hoc Cut-Off Date  
December 13, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 107 Human Nutrition December 2014 Ad Hoc Review
Termination Date   September 30, 2019 Program Analyst:   Chris
Number of Projects in the Review   1 Planned Duration   34 months
Status of Reviews   PDRAM is due to OSQR June 2, 2014.
Concurrence Memo Due to Area Director   May 19, 2014
PDRAMs Due to Area & OSQR with Schedule   June 2, 2014
Conflicts of Interest List Due to OSQR   June 16, 2014
Project Plans due to OSQR   December 1, 2014
Review Period   December 2014-March 2015
Project's Targeted Implementation Date   May 11, 2015
Ad Hoc Cut-Off Date  
N/A
Review Title NP 107 Human Nutrition Panel Review Schedule A
Termination Date   December 31, 2014 Program Analyst:   Chris
Number of Projects in the Review   33 Planned Duration   60 months
Status of Reviews   Revision and certifications are in progress.
Concurrence Memo Due to Area Director   February 21, 2013-complete
PDRAMs Due to Area & OSQR with Schedule   February 28, 2013-complete
Conflicts of Interest List Due to OSQR   March 14, 2013-complete
Project Plans due to OSQR   September 30, 2013-complete
Review Period   September 31, 2013-January 20, 2014
Project's Targeted Implementation Date   June 6, 2014
Ad Hoc Cut-Off Date  
February 21, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 107 Human Nutrition Panel Review Schedule A - Future
Termination Date   September 30, 2019 Program Analyst:   Chris
Number of Projects in the Review   61 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Human Nutrition Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   February 15, 2018
PDRAMs Due to Area & OSQR with Schedule   March 1, 2018
Conflicts of Interest List Due to OSQR   March 15, 2018
Project Plans due to OSQR   August 30, 2018
Review Period   August-December 2018
Project's Targeted Implementation Date   March 11, 2019
Ad Hoc Cut-Off Date  
February 15, 2016. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 107 Human Nutrition Panel Review Schedule B
Termination Date   December 31, 2014 Program Analyst:   Chris
Number of Projects in the Review   28 Planned Duration   60 months
Status of Reviews   Revision and certifications are in progress.
Concurrence Memo Due to Area Director   February 21, 2013-complete
PDRAMs Due to Area & OSQR with Schedule   April 1, 2013-complete
Conflicts of Interest List Due to OSQR   April 15, 2013-complete
Project Plans due to OSQR   October 28, 2013-complete
Review Period   October 29, 2013 – February 21, 2014
Project's Targeted Implementation Date   June 6, 2014
Ad Hoc Cut-Off Date  
February 21, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 107 Human Nutrition Panel Review Schedule B - Future
Termination Date   September 30, 2019 Program Analyst:   Chris
Number of Projects in the Review   61 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Human Nutrition Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   February 15, 2018
PDRAMs Due to Area & OSQR with Schedule   April 2, 2018
Conflicts of Interest List Due to OSQR   April 16, 2018
Project Plans due to OSQR   October 1, 2018
Review Period   October 2018-January 2019
Project's Targeted Implementation Date   March 11, 2019
Ad Hoc Cut-Off Date  
February 15, 2016. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 108 Food Safety (Animal and Plant Products) Panel Review
Termination Date   August 31, 2016 Program Analyst:   Chris
Number of Projects in the Review   65 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. No new ad hoc reviews are being scheduled in this National Program.
Concurrence Memo Due to Area Director   February 18, 2015
PDRAMs Due to Area & OSQR with Schedule   March 4, 2015
Conflicts of Interest List Due to OSQR   March 18, 2015
Project Plans due to OSQR   September 2, 2015
Review Period   September 3-December 9, 2015
Project's Targeted Implementation Date   February 10, 2016
Ad Hoc Cut-Off Date  
February 18, 2013. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 211 Water Availability and Watershed Management Panel Review
Termination Date   June 30, 2017 Program Analyst:   Chris
Number of Projects in the Review   37 Planned Duration   60 months
Status of Reviews   Preliminary planning. No new ad hocs are being scheduled for this National Program.
Concurrence Memo Due to Area Director   January 15, 2016
PDRAMs Due to Area & OSQR with Schedule   January 29, 2016
Conflicts of Interest List Due to OSQR   February 12, 2016
Project Plans due to OSQR   July 29, 2016
Review Period   August 1 - November 4, 2016
Project's Targeted Implementation Date   December 30, 2016
Ad Hoc Cut-Off Date  
January 15, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 212/214 Climate Change, Soils and Emissions Panel Review
Termination Date   December 31, 2016 Program Analyst:   Chris
Number of Projects in the Review   38 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. No new ad hocs are being scheduled for this National Program.
Concurrence Memo Due to Area Director   May 19, 2015
PDRAMs Due to Area & OSQR with Schedule   June 2, 2015
Conflicts of Interest List Due to OSQR   June 16, 2015
Project Plans due to OSQR   December 1, 2015
Review Period   December 2015-March 2016
Project's Targeted Implementation Date   June 2, 2016
Ad Hoc Cut-Off Date  
April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 213 Biorefining Panel Review
Termination Date   April 30, 2015 Program Analyst:   Chris
Number of Projects in the Review   11 Planned Duration   60 months
Status of Reviews   Project plans are due to OSQR May 16, 2014.
Concurrence Memo Due to Area Director   November 1, 2013-complete
PDRAMs Due to Area & OSQR with Schedule   November 15, 2013-complete
Conflicts of Interest List Due to OSQR   December 2, 2013-complete
Project Plans due to OSQR   May 16, 2014
Review Period   May 19-August 22, 2014
Project's Targeted Implementation Date   October 17, 2014
Ad Hoc Cut-Off Date  
October 18, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 215 Pasture, Forage and Rangeland Systems December 2014 Ad Hoc Review
Termination Date   June 30, 2018 Program Analyst:   Linda
Number of Projects in the Review   1 Planned Duration   31 months
Status of Reviews   PDRAM is due June 2, 2014.
Concurrence Memo Due to Area Director   May 19, 2014
PDRAMs Due to Area & OSQR with Schedule   June 2, 2014
Conflicts of Interest List Due to OSQR   June 16, 2014
Project Plans due to OSQR   December 1, 2014
Review Period   December 2014-March 2015
Project's Targeted Implementation Date   May 11, 2015
Ad Hoc Cut-Off Date  
Review Title NP 215 Pasture, Forage and Rangeland Systems Panel Review
Termination Date   June 30, 2018 Program Analyst:   Linda
Number of Projects in the Review   25 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Pasture, Forage and Rangeland Systems Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   December 9, 2016
PDRAMs Due to Area & OSQR with Schedule   December 23, 2016
Conflicts of Interest List Due to OSQR   January 6, 2017
Project Plans due to OSQR   June 23, 2017
Review Period   June 26-September 29, 2017
Project's Targeted Implementation Date   December 1, 2017
Ad Hoc Cut-Off Date  
December 9, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 216 Agricultural System Competitiveness and Sustainability December 2014 Ad Hoc Review
Termination Date   February 28, 2019 Program Analyst:   Linda
Number of Projects in the Review   1 Planned Duration   39 months
Status of Reviews   PDRAM is due to OSQR June 2, 2014
Concurrence Memo Due to Area Director   May 19, 2014
PDRAMs Due to Area & OSQR with Schedule   June 2, 2014
Conflicts of Interest List Due to OSQR   June 16, 2014
Project Plans due to OSQR   December 1, 2014
Review Period   December 2014 - March 2015
Project's Targeted Implementation Date   May 11, 2015
Ad Hoc Cut-Off Date  
Review Title NP 216 Agricultural System Competitiveness and Sustainability Panel Review
Termination Date   February 28, 2019 Program Analyst:   Linda
Number of Projects in the Review   14 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Agricultural System Competitiveness and Sustainability Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   August 25, 2017
PDRAMs Due to Area & OSQR with Schedule   September 15, 2017
Conflicts of Interest List Due to OSQR   September 29, 2017
Project Plans due to OSQR   March 16, 2018
Review Period   March 19-June 22, 2018
Project's Targeted Implementation Date   August 24, 2018
Ad Hoc Cut-Off Date  
August 25, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 301 Plant Genetic Resouces, Genomics & Genetic Improvement December 2014 Ad Hoc Review
Termination Date   September 30, 2018 Program Analyst:   Chris & Linda
Number of Projects in the Review   1 Planned Duration   34 months
Status of Reviews   PDRAM is due to OSQR June 2, 2014
Concurrence Memo Due to Area Director   May 19, 2014
PDRAMs Due to Area & OSQR with Schedule   June 2, 2014
Conflicts of Interest List Due to OSQR   June 16, 2014
Project Plans due to OSQR   December 1, 2014
Review Period   December 2014-March 2015
Project's Targeted Implementation Date   May 11, 2015
Ad Hoc Cut-Off Date  
N/A
Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule A
Termination Date   September 30, 2018 Program Analyst:   Chris & Linda
Number of Projects in the Review   155 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   January 17, 2017
PDRAMs Due to Area & OSQR with Schedule   January 31, 2017
Conflicts of Interest List Due to OSQR   February 14, 2017
Project Plans due to OSQR   August 1, 2017
Review Period   August 2-November 7, 2017
Project's Targeted Implementation Date   March 12, 2018
Ad Hoc Cut-Off Date  
January 17, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule B
Termination Date   September 30, 2018 Program Analyst:   Chris & Linda
Number of Projects in the Review   155 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   January 17, 2017
PDRAMs Due to Area & OSQR with Schedule   March 3, 2017
Conflicts of Interest List Due to OSQR   March 17, 2017
Project Plans due to OSQR   September 1, 2017
Review Period   September 4-December 8, 2017
Project's Targeted Implementation Date   March 12, 2018
Ad Hoc Cut-Off Date  
January 17, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule C
Termination Date   September 30, 2018 Program Analyst:   Chris & Linda
Number of Projects in the Review   155 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   January 17, 2017
PDRAMs Due to Area & OSQR with Schedule   April 3, 2017
Conflicts of Interest List Due to OSQR   April 17, 2017
Project Plans due to OSQR   October 2, 2017
Review Period   October 3, 2017-January 8, 2018
Project's Targeted Implementation Date   March 12, 2018
Ad Hoc Cut-Off Date  
January 17, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 303 Plant Diseases Panel Review
Termination Date   August 31, 2017 Program Analyst:   Linda
Number of Projects in the Review   57 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. No new ad hocs are being scheduled for this National Program.
Concurrence Memo Due to Area Director   March 7, 2016
PDRAMs Due to Area & OSQR with Schedule   March 21, 2016
Conflicts of Interest List Due to OSQR   April 4, 2016
Project Plans due to OSQR   September 19, 2016
Review Period   September 20-December 26, 2016
Project's Targeted Implementation Date   February 27, 2017
Ad Hoc Cut-Off Date  
March 7, 2014. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule A
Termination Date   March 31, 2016 Program Analyst:   Linda
Number of Projects in the Review   73 Planned Duration   60 months
Status of Reviews   PDRAMS are due to OSQR July 18, 2014.
Concurrence Memo Due to Area Director   July 3, 2014
PDRAMs Due to Area & OSQR with Schedule   July 18, 2014
Conflicts of Interest List Due to OSQR   August 5, 2014
Project Plans due to OSQR   January 20, 2015
Review Period   January 21-April 28, 2015
Project's Targeted Implementation Date   September 9, 2015
Ad Hoc Cut-Off Date  
June 24, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule B
Termination Date   March 31, 2016 Program Analyst:   Linda
Number of Projects in the Review   73 Planned Duration   60 months
Status of Reviews   PDRAMs are due to OSQR September 17, 2014.
Concurrence Memo Due to Area Director   July 3, 2014
PDRAMs Due to Area & OSQR with Schedule   September 17, 2014
Conflicts of Interest List Due to OSQR   October 1, 2014
Project Plans due to OSQR   March 18, 2015
Review Period   March 19-June 24, 2015
Project's Targeted Implementation Date   September 9, 2015
Ad Hoc Cut-Off Date  
June 24, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 305 Crop Production Panel Review
Termination Date   May 31, 2014 Program Analyst:   Chris
Number of Projects in the Review   27 Planned Duration   60 months
Status of Reviews   Revisions and certifications are in progress.
Concurrence Memo Due to Area Director   November 30, 2012-complete
PDRAMs Due to Area & OSQR with Schedule   December 28, 2012-complete
Conflicts of Interest List Due to OSQR   January 11, 2013-complete
Project Plans due to OSQR   July 29, 2013-complete
Review Period   October 1-October 31, 2013
Project's Targeted Implementation Date   December 29, 2013
Ad Hoc Cut-Off Date  
November 30, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 305 Crop Production Panel Review - Future
Termination Date   April 30, 2019 Program Analyst:   Chris
Number of Projects in the Review   27 Planned Duration   60 months
Status of Reviews   Long-term planning in progress. Existing ARS projects entering or modified under the Crop Production Program must be considered for an updated peer review.
Concurrence Memo Due to Area Director   October 20, 2017
PDRAMs Due to Area & OSQR with Schedule   November 3, 2017
Conflicts of Interest List Due to OSQR   November 17, 2017
Project Plans due to OSQR   May 4, 2018
Review Period   May-August, 2018
Project's Targeted Implementation Date   October 12, 2018
Ad Hoc Cut-Off Date  
October 20, 2015. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review Schedule A
Termination Date   November 30, 2015 Program Analyst:   Chris
Number of Projects in the Review   35 Planned Duration   60 months
Status of Reviews   PDRAMS are due to OSQR May 20, 2014.
Concurrence Memo Due to Area Director   May 6, 2014
PDRAMs Due to Area & OSQR with Schedule   May 20, 2014
Conflicts of Interest List Due to OSQR   June 3, 2014
Project Plans due to OSQR   November 18, 2014
Review Period   November 2014-February 2015
Project's Targeted Implementation Date   May 26, 2015
Ad Hoc Cut-Off Date  
April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review Schedule B
Termination Date   November 30, 2015 Program Analyst:   Chris
Number of Projects in the Review   35 Planned Duration   60 months
Status of Reviews   PDRAMs are due to OSQR June 17, 2014.
Concurrence Memo Due to Area Director   May 6,2014
PDRAMs Due to Area & OSQR with Schedule   June 17, 2014
Conflicts of Interest List Due to OSQR   July 1, 2014
Project Plans due to OSQR   December 16, 2014
Review Period   December 2014-March 2015
Project's Targeted Implementation Date   May 26, 2015
Ad Hoc Cut-Off Date  
April 8, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session.
 
Last Updated: July 23, 2014
Last Modified: 7/23/2014
Footer Content Back to Top of Page