| Schedule of Peer Reviews |
|
|
Scientific Quality Review
| Directions for Setting Termination Dates |
|
The dates listed are projected. Actual dates are announced at the beginning of each peer review session. For efficiency, we simply calculate the termination date as 6 months beyond the projected implementation date. If you have used a different date, there’s no need to change it if it’s beyond the projected implementation date. This method eases our coordination in the event peer review sessions are added or postponed. |
|
|
Animal Production & Protection |
Nutrition, Food Safety/Quality
|
Natural Resources and Sustainable Agricultural Systems |
Crop Production & Protection
|
|
|
|
|
|
|
| Review Title NP 101 Food Animal Production Panel Review |
| Termination Date March 30, 2013 |
Program Analyst: Chris |
| Number of Projects in the Review 32 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modifed under the Food Animal Production Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
September 16, 2011 |
| PDRAMs Due to Area & OSQR with Schedule |
October 14, 2011 |
| Conflicts of Interest List Due to OSQR |
October 28, 2011 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
April 13, 2012 |
| Review Period |
April 16-July 20, 2012 |
| Project's Targeted Implementation Date |
September 14, 2012 |
Ad Hoc Cut-Off Date July 29, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 103 Animal Health Panel Review |
| Termination Date April 30, 2012 |
Program Analyst: Chris |
| Number of Projects in the Review 45 |
Planned Duration 60 months |
| Status of Reviews Long term planning in progress. No new ad hoc reviews are being scheduled in this program. |
| Concurrence Memo Due to Area Director |
October 20, 2010 |
| PDRAMs Due to Area & OSQR with Schedule |
November 17, 2010 |
| Conflicts of Interest List Due to OSQR |
December 1, 2010 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
May 18, 2011 |
| Review Period |
May 19 - August 24, 2011 |
| Project's Targeted Implementation Date |
October 19, 2011 |
Ad Hoc Cut-Off Date September 1, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 104 Veterinary, Medical and Urban Entomology Panel Review |
| Termination Date March 31, 2010 |
Program Analyst: Chris |
| Number of Projects in the Review 17 |
Planned Duration 60 months |
| Status of Reviews Reviews are in progress. |
| Concurrence Memo Due to Area Director |
July 28, 2008 |
| PDRAMs Due to Area & OSQR with Schedule |
August 25, 2008-complete |
| Conflicts of Interest List Due to OSQR |
September 8, 2008-complete |
| Approved PPOs Due to Area and OSQR from NPS |
December 22, 2008-complete |
| Project Plans due to OSQR |
April 13, 2009-complete |
| Review Period |
April 14 - July 20, 2009 |
| Project's Targeted Implementation Date |
September 14, 2009 |
Ad Hoc Cut-Off Date July 28, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 104 Veterinary, Medical and Urban Entomology Panel Review - Future |
| Termination Date March 30, 2015 |
Program Analyst: Chris |
| Number of Projects in the Review 17 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Veterinary, Medical, and Urban Entomology Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
October 4, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
October 11, 2013 |
| Conflicts of Interest List Due to OSQR |
October 25, 2013 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
April 11, 2014 |
| Review Period |
April 14-July 18, 2014 |
| Project's Targeted Implementation Date |
September 12, 2014 |
Ad Hoc Cut-Off Date October 4, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 106 Aquaculture 2010 Ad Hoc Review |
| Termination Date June 30, 2015 |
Program Analyst: Chris |
| Number of Projects in the Review 1 |
Planned Duration 55 months |
| Status of Reviews The PDRAM is due December 8, 2009. |
| Concurrence Memo Due to Area Director |
November 10, 2009 |
| PDRAMs Due to Area & OSQR with Schedule |
December 8, 2009 |
| Conflicts of Interest List Due to OSQR |
December 22, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
June 8, 2010 |
| Review Period |
June 9-September 14, 2009 |
| Project's Targeted Implementation Date |
November 9, 2010 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 106 Aquaculture Panel Review |
| Termination Date June 30, 2010 |
Program Analyst: Chris |
| Number of Projects in the Review 25 |
Planned Duration 60 months |
| Status of Reviews Project plans are due to OSQR July 10, 2009. |
| Concurrence Memo Due to Area Director |
September 23, 2008-complete |
| PDRAMs Due to Area & OSQR with Schedule |
October 21, 2008-complete |
| Conflicts of Interest List Due to OSQR |
November 4, 2008-complete |
| Approved PPOs Due to Area and OSQR from NPS |
March 20, 2009-complete |
| Project Plans due to OSQR |
July 10, 2009 |
| Review Period |
July 20 - October 16, 2009 |
| Project's Targeted Implementation Date |
December 11, 2009 |
Ad Hoc Cut-Off Date August 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 106 Aquaculture Panel Review - Future |
| Termination Date June 30, 2015 |
Program Analyst: Chris |
| Number of Projects in the Review 25 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Aquaculture Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
January 3, 2014 |
| PDRAMs Due to Area & OSQR with Schedule |
January 10, 2014 |
| Conflicts of Interest List Due to OSQR |
January 24, 2014 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
July 11, 2014 |
| Review Period |
July 14 - October 17, 2014 |
| Project's Targeted Implementation Date |
December 12, 2014 |
Ad Hoc Cut-Off Date January 3, 2012. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 107 Human Nutrition - Future |
| Termination Date September 30, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 65 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modifed under the Human Nutrition Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
March 4, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
April 1, 2013 |
| Conflicts of Interest List Due to OSQR |
April 15, 2013 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
September 30, 2013 |
| Review Period |
October 1, 2013-January 6, 2014 |
| Project's Targeted Implementation Date |
March 3, 2014 |
Ad Hoc Cut-Off Date February 4, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 107 Human Nutrition 2010 Ad Hoc Review |
| Termination Date September 30, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 2 |
Planned Duration 46 months |
| Status of Reviews PDRAMs are due December 8, 2009. |
| Concurrence Memo Due to Area Director |
November 10, 2009 |
| PDRAMs Due to Area & OSQR with Schedule |
December 8, 2009 |
| Conflicts of Interest List Due to OSQR |
December 22, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
June 8, 2010 |
| Review Period |
June 9 - September 14, 2010 |
| Project's Targeted Implementation Date |
November 9, 2010 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 107 Human Nutrition December 2009 Ad Hoc Review |
| Termination Date September 30, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 4 |
Planned Duration 53 months |
| Status of Reviews PPOs are due to OSQR August 11, 2009. |
| Concurrence Memo Due to Area Director |
April 7, 2009-complete |
| PDRAMs Due to Area & OSQR with Schedule |
April 14, 2009-complete |
| Conflicts of Interest List Due to OSQR |
April 28, 2009-complete |
| Approved PPOs Due to Area and OSQR from NPS |
August 11, 2009 |
| Project Plans due to OSQR |
December 1, 2009 |
| Review Period |
December 2, 2009-February 9, 2010 |
| Project's Targeted Implementation Date |
April 19, 2010 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 107 Human Nutrition June 2009 Ad Hoc Review |
| Termination Date September 30, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 10 |
Planned Duration 58 months |
| Status of Reviews Reviews are in progress. |
| Concurrence Memo Due to Area Director |
October 10, 2008-complete |
| PDRAMs Due to Area & OSQR with Schedule |
October 17, 2008-complete |
| Conflicts of Interest List Due to OSQR |
October 31, 2008-complete |
| Approved PPOs Due to Area and OSQR from NPS |
February 13, 2009-complete |
| Project Plans due to OSQR |
June 5, 2009-complete |
| Review Period |
June 8-September 11, 2009 |
| Project's Targeted Implementation Date |
November 20, 2009 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 107 Human Nutrition October 2009 Ad Hoc Review |
| Termination Date September 30, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 4 |
Planned Duration 56 months |
| Status of Reviews Plans are due September 15, 2009 |
| Concurrence Memo Due to Area Director |
May 29, 2009-complete |
| PDRAMs Due to Area & OSQR with Schedule |
June 12, 2009-complete |
| Conflicts of Interest List Due to OSQR |
June 12, 2009-complete |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
September 15, 2009 |
| Review Period |
September 16-November 23, 2009 |
| Project's Targeted Implementation Date |
February 1, 2010 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 107 Human Nutrition Panel Review - Schedule A |
| Termination Date June 30, 2009 |
Program Analyst: Chris |
| Number of Projects in the Review 65 |
Planned Duration 60 months |
| Status of Reviews Revision and certification in progress. |
| Concurrence Memo Due to Area Director |
September 28, 2007-complete |
| PDRAMs Due to Area & OSQR with Schedule |
October 26, 2007-complete |
| Conflicts of Interest List Due to OSQR |
November 8, 2007-complete |
| Approved PPOs Due to Area and OSQR from NPS |
February 22, 2008-complete |
| Project Plans due to OSQR |
June 13, 2008-complete |
| Review Period |
June 16 - September 19, 2008-complete |
| Project's Targeted Implementation Date |
December 22, 2008 |
Ad Hoc Cut-Off Date August 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 107 Human Nutrition Panel Review - Schedule B |
| Termination Date June 30, 2009 |
Program Analyst: Chris |
| Number of Projects in the Review 65 |
Planned Duration 60 months |
| Status of Reviews Revision and certification in progress. |
| Concurrence Memo Due to Area Director |
September 28, 2007-complete |
| PDRAMs Due to Area & OSQR with Schedule |
December 3, 2007-complete |
| Conflicts of Interest List Due to OSQR |
December 17, 2007-complete |
| Approved PPOs Due to Area and OSQR from NPS |
March 31, 2008-complete |
| Project Plans due to OSQR |
July 21, 2008-complete |
| Review Period |
July 22 - October 27, 2008-complete |
| Project's Targeted Implementation Date |
December 22, 2008 |
Ad Hoc Cut-Off Date August 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 108 Food Safety Panel Review |
| Termination Date August 31, 2011 |
Program Analyst: Chris |
| Number of Projects in the Review 68 |
Planned Duration 60 months |
| Status of Reviews Long term planning in progress. No new ad hoc reviews are being scheduled in this program. |
| Concurrence Memo Due to Area Director |
February 5, 2010 |
| PDRAMs Due to Area & OSQR with Schedule |
March 5, 2010 |
| Conflicts of Interest List Due to OSQR |
March 19, 2010 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
September 3, 2010 |
| Review Period |
September 7-December 10, 2010 |
| Project's Targeted Implementation Date |
February 18, 2011 |
Ad Hoc Cut-Off Date October 6, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 202/212 Soil Resource Management Panel Review |
| Termination Date December 31, 2011 |
Program Analyst: Linda |
| Number of Projects in the Review 25 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hoc reviews are being scheduled in this program. |
| Concurrence Memo Due to Area Director |
June 17, 2010 |
| PDRAMs Due to Area & OSQR with Schedule |
July 15, 2010 |
| Conflicts of Interest List Due to OSQR |
July 29, 2010 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
January 12, 2011 |
| Review Period |
January 13 - April 20, 2011 |
| Project's Targeted Implementation Date |
June 15, 2011 |
Ad Hoc Cut-Off Date May 19, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 203/204/212 Soil and Air Resource Management Panel Review |
| Termination Date October 31, 2010 |
Program Analyst: Chris |
| Number of Projects in the Review 20 |
Planned Duration 60 months |
| Status of Reviews PPOs are due from ONP to the Area and OSQR July 15, 2009. |
| Concurrence Memo Due to Area Director |
February 18, 2009-complete |
| PDRAMs Due to Area & OSQR with Schedule |
March 18, 2009-complete |
| Conflicts of Interest List Due to OSQR |
April 1, 2009-complete |
| Approved PPOs Due to Area and OSQR from NPS |
July 15, 2009 |
| Project Plans due to OSQR |
November 4, 2009 |
| Review Period |
November 5, 2009 - February 10, 2010 |
| Project's Targeted Implementation Date |
April 7, 2010 |
Ad Hoc Cut-Off Date December 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 206/214 Manure and Byproduct Utilization Panel Review |
| Termination Date January 31, 2011 |
Program Analyst: Linda |
| Number of Projects in the Review 27 |
Planned Duration 60 months |
| Status of Reviews PDRAMs are due to the Area and OSQR on August 13, 2009. |
| Concurrence Memo Due to Area Director |
July 16, 2009 |
| PDRAMs Due to Area & OSQR with Schedule |
August 13, 2009 |
| Conflicts of Interest List Due to OSQR |
August 27, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
February 11, 2010 |
| Review Period |
February 12-May 21, 2010 |
| Project's Targeted Implementation Date |
July 16, 2010 |
Ad Hoc Cut-Off Date July 28, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 211 Water Availability and Watershed Management Panel Review |
| Termination Date August 31, 2012 |
Program Analyst: Chris |
| Number of Projects in the Review 49 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hoc reviews are being scheduled in this program. |
| Concurrence Memo Due to Area Director |
February 9, 2011 |
| PDRAMs Due to Area & OSQR with Schedule |
March 9, 2011 |
| Conflicts of Interest List Due to OSQR |
March 23, 2011 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
September 7, 2011 |
| Review Period |
September 8-December 14, 2011 |
| Project's Targeted Implementation Date |
February 12, 2012 |
Ad Hoc Cut-Off Date November 27, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 213 Bioenergy Panel Review - Future |
| Termination Date April 30, 2015 |
Program Analyst: Linda |
| Number of Projects in the Review 15 |
Planned Duration Chris |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Bioenergy Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
October 18, 2013 |
| PDRAMs Due to Area & OSQR with Schedule |
November 15, 2013 |
| Conflicts of Interest List Due to OSQR |
December 2, 2013 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
May 16, 2014 |
| Review Period |
May 19-August 22, 2014 |
| Project's Targeted Implementation Date |
October 17, 2014 |
Ad Hoc Cut-Off Date November 8, 2011. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 215 Pasture, Forage, Turf and Rangeland Systems Panel Review |
| Termination Date July 30, 2013 |
Program Analyst: Chris |
| Number of Projects in the Review 32 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Rangeland, Pasture and Forages National Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
January 24, 2012 |
| PDRAMs Due to Area & OSQR with Schedule |
February 21, 2012 |
| Conflicts of Interest List Due to OSQR |
March 20, 2012 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
August 20, 2012 |
| Review Period |
August 21 - November 26, 2012 |
| Project's Targeted Implementation Date |
January 21, 2013 |
Ad Hoc Cut-Off Date December 6, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 216 Agricultural System Competiveness and Sustainability Panel Review |
| Termination Date February 28, 2014 |
Program Analyst: Chris |
| Number of Projects in the Review 21 |
Planned Duration 60 |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modifed under the Agricultural System Competiveness Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
August 10, 2012 |
| PDRAMs Due to Area & OSQR with Schedule |
September 7, 2012 |
| Conflicts of Interest List Due to OSQR |
September 21, 2012 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
March 8, 2013 |
| Review Period |
March 11 - June 14, 2013 |
| Project's Targeted Implementation Date |
August 9, 2013 |
Ad Hoc Cut-Off Date July 13, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement 2009 Ad Hoc Review |
| Termination Date November 30, 2013 |
Program Analyst: Linda |
| Number of Projects in the Review 2 |
Planned Duration 48 months |
| Status of Reviews Reviews are in progress. |
| Concurrence Memo Due to Area Director |
October 10, 2008-complete |
| PDRAMs Due to Area & OSQR with Schedule |
October 17, 2008-complete |
| Conflicts of Interest List Due to OSQR |
October 31, 2008-complete |
| Approved PPOs Due to Area and OSQR from NPS |
February 13, 2009-complete |
| Project Plans due to OSQR |
June 5, 2009-complete |
| Review Period |
June 8 - September 11, 2009 |
| Project's Targeted Implementation Date |
November 20, 2009 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement 2010 Ad Hoc Review |
| Termination Date November 30, 2013 |
Program Analyst: Linda |
| Number of Projects in the Review 2 |
Planned Duration 36 months |
| Status of Reviews The PDRAM is due December 8, 2009. |
| Concurrence Memo Due to Area Director |
November 10, 2009 |
| PDRAMs Due to Area & OSQR with Schedule |
December 8, 2009 |
| Conflicts of Interest List Due to OSQR |
December 22, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
June 8, 2010 |
| Review Period |
June 9-September 14, 2010 |
| Project's Targeted Implementation Date |
November 9, 2010 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule A |
| Termination Date November 30, 2013 |
Program Analyst: Linda |
| Number of Projects in the Review 125 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement National Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
March 29, 2012 |
| PDRAMs Due to Area & OSQR with Schedule |
April 26, 2012 |
| Conflicts of Interest List Due to OSQR |
May 11, 2012 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
October 29, 2012 |
| Review Period |
October 30, 2012-February 5, 2013 |
| Project's Targeted Implementation Date |
May 1, 2013 |
Ad Hoc Cut-Off Date March 29, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 301 Plant Genetic Resources, Genomics and Genetic Improvement Panel Review Schedule B |
| Termination Date November 30, 2013 |
Program Analyst: Linda |
| Number of Projects in the Review 125 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Plant Genetic Resources, Genomics and Genetic Improvement National Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
March 29, 2012 |
| PDRAMs Due to Area & OSQR with Schedule |
May 25, 2012 |
| Conflicts of Interest List Due to OSQR |
June 8, 2012 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
November 26, 2012 |
| Review Period |
November 27, 2012-March 5, 2013 |
| Project's Targeted Implementation Date |
May 1, 2013 |
Ad Hoc Cut-Off Date
| |
| Review Title NP 302 Plant Biological and Molecular Processes Panel Review |
| Termination Date September 30, 2011 |
Program Analyst: Chris |
| Number of Projects in the Review 43 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hoc reviews are being scheduled for this program. |
| Concurrence Memo Due to Area Director |
March 16, 2010 |
| PDRAMs Due to Area & OSQR with Schedule |
April 13, 2010 |
| Conflicts of Interest List Due to OSQR |
April 27, 2010 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
October 12, 2010 |
| Review Period |
October 13, 2010 - January 17, 2011 |
| Project's Targeted Implementation Date |
March 14, 2011 |
Ad Hoc Cut-Off Date January 25, 2008. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 303 Plant Diseases 2009 Ad Hoc Review |
| Termination Date May 31, 2010 |
Program Analyst: Linda |
| Number of Projects in the Review 4 |
Planned Duration 40 months |
| Status of Reviews Reviews are in progress. |
| Concurrence Memo Due to Area Director |
October 10, 2008-complete |
| PDRAMs Due to Area & OSQR with Schedule |
October 17, 2008-complete |
| Conflicts of Interest List Due to OSQR |
October 31, 2008-complete |
| Approved PPOs Due to Area and OSQR from NPS |
February 13, 2009-complete |
| Project Plans due to OSQR |
June 5, 2009 |
| Review Period |
June 8 - September 11, 2009 |
| Project's Targeted Implementation Date |
November 20, 2009 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 303 Plant Diseases Panel Review |
| Termination Date September 30, 2012 |
Program Analyst: Linda |
| Number of Projects in the Review 70 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hoc reviews are being scheduled in this program. |
| Concurrence Memo Due to Area Director |
March 18, 2011 |
| PDRAMs Due to Area & OSQR with Schedule |
April 15, 2011 |
| Conflicts of Interest List Due to OSQR |
April 29, 2011 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
October 14, 2011 |
| Review Period |
October 17, 2011 - January 20, 2012 |
| Project's Targeted Implementation Date |
March 16, 2012 |
Ad Hoc Cut-Off Date January 28, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule A |
| Termination Date April 30, 2011 |
Program Analyst: Linda |
| Number of Projects in the Review 87 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled in this program. |
| Concurrence Memo Due to Area Director |
June 22, 2009 |
| PDRAMs Due to Area & OSQR with Schedule |
July 17, 2009 |
| Conflicts of Interest List Due to OSQR |
July 31, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
November 13, 2009 |
| Project Plans due to OSQR |
March 5, 2010 |
| Review Period |
March 8 - June 11, 2010 |
| Project's Targeted Implementation Date |
October 4, 2010 |
Ad Hoc Cut-Off Date December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule B |
| Termination Date April 30, 2011 |
Program Analyst: Linda |
| Number of Projects in the Review 87 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled in this program. |
| Concurrence Memo Due to Area Director |
June 22, 2009 |
| PDRAMs Due to Area & OSQR with Schedule |
August 18, 2009 |
| Conflicts of Interest List Due to OSQR |
September 1, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
December 15, 2009 |
| Project Plans due to OSQR |
April 6, 2010 |
| Review Period |
April 7 - July 13, 2010 |
| Project's Targeted Implementation Date |
October 4, 2010 |
Ad Hoc Cut-Off Date December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 304 Crop Protection and Quarantine Panel Review - Schedule C |
| Termination Date April 30, 2011 |
Program Analyst: Linda |
| Number of Projects in the Review 87 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. No new ad hocs are being scheduled in this program. |
| Concurrence Memo Due to Area Director |
June 22, 2009 |
| PDRAMs Due to Area & OSQR with Schedule |
September 14, 2009 |
| Conflicts of Interest List Due to OSQR |
September 28, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
January 11, 2010 |
| Project Plans due to OSQR |
May 3, 2010 |
| Review Period |
May 4 - August 9, 2010 |
| Project's Targeted Implementation Date |
October 4, 2010 |
Ad Hoc Cut-Off Date December 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 305 Crop Production Panel Review |
| Termination Date May 31, 2014 |
Program Analyst: Linda |
| Number of Projects in the Review 24 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modifed under the Crop Production Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
November 30, 2012 |
| PDRAMs Due to Area & OSQR with Schedule |
December 28, 2012 |
| Conflicts of Interest List Due to OSQR |
January 11, 2013 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
June 28, 2013 |
| Review Period |
July 1 - October 4, 2013 |
| Project's Targeted Implementation Date |
November 29, 2013 |
Ad Hoc Cut-Off Date November 2, 2010. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 305 Crop Production Special Ad Hoc Review 2009 |
| Termination Date May 31, 2014 |
Program Analyst: Linda |
| Number of Projects in the Review 1 |
Planned Duration 47 months |
| Status of Reviews PPO is due from ONP to the Areas and to OSQR June 18, 2009. |
| Concurrence Memo Due to Area Director |
March 6, 2009-complete |
| PDRAMs Due to Area & OSQR with Schedule |
March 16, 2009-complete |
| Conflicts of Interest List Due to OSQR |
April 16, 2009-complete |
| Approved PPOs Due to Area and OSQR from NPS |
June 18, 2009 |
| Project Plans due to OSQR |
October 26, 2009 |
| Review Period |
October 31-December 31, 2009 |
| Project's Targeted Implementation Date |
June 15, 2010 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 306 Quality and Utilization of Agricultural Products 2010 Ad Hoc Review |
| Termination Date November 30, 2013 |
Program Analyst: Chris |
| Number of Projects in the Review 1 |
Planned Duration 34 months |
| Status of Reviews The PDRAM is due December 8, 2009. |
| Concurrence Memo Due to Area Director |
November 10, 2009 |
| PDRAMs Due to Area & OSQR with Schedule |
December 8, 2009 |
| Conflicts of Interest List Due to OSQR |
December 22, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
June 8, 2010 |
| Review Period |
June 9-September 14, 2010 |
| Project's Targeted Implementation Date |
November 9, 2010 |
Ad Hoc Cut-Off Date N/A | |
| Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review - Schedule B |
| Termination Date January 31, 2011 |
Program Analyst: Chris |
| Number of Projects in the Review 88 |
Planned Duration 60 months |
| Status of Reviews PPO's are due to the Area and OSQR September 22, 2009. |
| Concurrence Memo Due to Area Director |
March 30, 2009-complete |
| PDRAMs Due to Area & OSQR with Schedule |
May 26, 2009-complete |
| Conflicts of Interest List Due to OSQR |
June 9, 2009-complete |
| Approved PPOs Due to Area and OSQR from NPS |
September 22, 2009 |
| Project Plans due to OSQR |
January 12, 2010 |
| Review Period |
January 13 - April 20, 2010 |
| Project's Targeted Implementation Date |
July 13, 2010 |
Ad Hoc Cut-Off Date March 30, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 306 Quality and Utilization of Agricultural Products Panel Review - Schedule C |
| Termination Date January 31, 2011 |
Program Analyst: Chris |
| Number of Projects in the Review 88 |
Planned Duration 60 months |
| Status of Reviews PPO's are due to the Area and OSQR October 20, 2009. |
| Concurrence Memo Due to Area Director |
March 30, 2009-complete |
| PDRAMs Due to Area & OSQR with Schedule |
June 23, 2009-complete |
| Conflicts of Interest List Due to OSQR |
July 6, 2009 |
| Approved PPOs Due to Area and OSQR from NPS |
October 20, 2009 |
| Project Plans due to OSQR |
February 9, 2010 |
| Review Period |
February 10 - May 18, 2010 |
| Project's Targeted Implementation Date |
July 13, 2010 |
Ad Hoc Cut-Off Date March 30, 2007. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 307/213 Bioenergy and Energy Alternatives Panel Review |
| Termination Date April 30, 2010 |
Program Analyst: Linda |
| Number of Projects in the Review 15 |
Planned Duration 60 months |
| Status of Reviews Reviews are in progress. |
| Concurrence Memo Due to Area Director |
September 1, 2008-complete |
| PDRAMs Due to Area & OSQR with Schedule |
September 29, 2008-complete |
| Conflicts of Interest List Due to OSQR |
October 14, 2008-complete |
| Approved PPOs Due to Area and OSQR from NPS |
January 26, 2009-complete |
| Project Plans due to OSQR |
May 18, 2009-complete |
| Review Period |
May 19 - August 24, 2009 |
| Project's Targeted Implementation Date |
October 19, 2009 |
Ad Hoc Cut-Off Date June 30, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | |
| Review Title NP 308 Methyl Bromide Panel Review |
| Termination Date May 31, 2013 |
Program Analyst: Linda |
| Number of Projects in the Review 16 |
Planned Duration 60 months |
| Status of Reviews Long-term planning in progress. Existing ARS projects entering or modified under the Methyl Bromide National Program must be considered for an updated peer review. |
| Concurrence Memo Due to Area Director |
November 16, 2011 |
| PDRAMs Due to Area & OSQR with Schedule |
December 14, 2011 |
| Conflicts of Interest List Due to OSQR |
December 28, 2011 |
| Approved PPOs Due to Area and OSQR from NPS |
N/A |
| Project Plans due to OSQR |
June 13, 2012 |
| Review Period |
June 14 - September 19, 2012 |
| Project's Targeted Implementation Date |
November 14, 2012 |
Ad Hoc Cut-Off Date September 28, 2009. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. | | |
|
|
|
|